San Joaquin Delta College Athletic Fields Renovation

McGuire and Hester led the comprehensive renovation of San Joaquin Delta College’s football, softball, and baseball facilities, revitalizing 6.8 acres of active campus athletic space. Serving as the design-build partner and self-performing contractor, our team delivered demolition, grading, underground utilities, concrete, and landscaping to transform previously unplayable fields into a high-performance, low-maintenance athletic complex. The renovated facilities are engineered for durability, long-term efficiency, and future system upgrades—positioning the college to support student-athletes and the broader community for decades to come.

Details

OWNER: San Joaquin Delta College

LOCATION: Stockton, California

GENERAL CONTRACTOR: McGuire and Hester

CONTRACT VALUE: $16.5 MM

Type of Project

Education

Services We Provided

Building the Foundation for the Next Generation of Student-Athletes

Delivering a multi-field renovation within an active campus environment required disciplined coordination, adaptable field execution, and proactive stakeholder engagement. Existing field conditions differed from original documentation, requiring real-time grading and drainage modifications to maintain design intent and performance standards. McGuire and Hester leveraged GPS-enabled layout and verification technology to ensure grading precision and system accuracy, minimizing delays while maintaining schedule control.

Environmental stewardship was integrated throughout construction. The team reused existing infrastructure where feasible and optimized earthwork operations to reduce material import and export. Upgraded drainage systems now efficiently manage stormwater across the 6.8-acre site, improving field resiliency and reducing runoff. Turf installation included environmentally responsible infill and carefully prepared subgrades to support long-term performance with reduced maintenance demands. All work was sequenced to protect surrounding campus landscapes and minimize disruption to daily college operations.

As a self-performing contractor, McGuire and Hester maintained direct control over demolition, grading, utilities, concrete, and landscape scopes, resulting in tighter schedule management and seamless trade coordination. Early design-build engagement allowed the team to refine scope, align expectations, and anticipate future campus needs. Underground infrastructure was strategically installed to accommodate future lighting and audio-visual enhancements, ensuring the complex can evolve without major reconstruction.

Weekly on-site collaboration with coaches, campus leadership, and maintenance personnel supported informed decision-making and strengthened long-term partnership. The renovated complex restores critical athletic facilities that had previously been unserviceable, significantly improving safety, usability, and student-athlete experience. Today, the upgraded fields stand as a durable, high-quality asset for San Joaquin Delta College—reinforcing the institution’s commitment to health, performance, and community engagement.

 

Worksite Images

More Projects With Same Services

Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 Next

More Projects In Similar Markets

McGuire and Hester Alameda Office

San Joaquin County BeWell Behavioral Health Campus