Truckee Airport
McGuire and Hester partnered with the Truckee Tahoe Airport District to deliver the Apron A2 Reconstruction and Snow Melt System project, a critical infrastructure improvement designed to enhance airfield operations, drainage performance, and winter reliability at one of Northern California’s premier mountain airports. Reconstructing approximately 270,000 square feet of apron and taxiway pavement, the project also included upgrades to underground utilities, drainage systems, and snow melt infrastructure. Through strategic phasing and careful construction sequencing, the project was completed while maintaining operational efficiency and preparing the airport for long-term service in a challenging alpine environment.
Details
OWNER: Truckee Tahoe Airport District
LOCATION: Truckee, California
GENERAL CONTRACTOR: McGuire and Hester
CONTRACT VALUE: $5.1 MM
Type of Project
Transportation
Services We Provided
Built for All Seasons: Strengthening Airport Operations in Truckee
Constructing and rehabilitating airport infrastructure in Truckee’s high-elevation climate required adaptability, technical expertise, and a commitment to quality under demanding conditions. McGuire and Hester demolished and replaced existing pavement in two phases, removing approximately 4,460 cubic yards of unsuitable material before rebuilding the apron section to its new design elevation. The project also included installation of 700 linear feet of trench drainage, a new snow melt apron system, underground electrical and communication conduits, and protective concrete encasement for existing utility infrastructure.
Delivering this work in Truckee’s mountain environment required careful planning, flexibility, and close coordination among project collaborators. The team navigated changing weather conditions while balancing multiple critical work activities and maintaining airport operations throughout construction. By adapting sequencing as conditions evolved and proactively coordinating with project partners, McGuire and Hester kept the project moving efficiently while maintaining high standards for safety and quality. The completed improvements strengthen airfield functionality, improve drainage and winter performance, and provide the Truckee Tahoe Airport District with resilient infrastructure designed to serve pilots, passengers, and the surrounding community for years to come.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
Truckee Tahoe Airport Apron A2 Reconstruction
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

McGuire and Hester Alameda Office
City of Woodland Sewer Effluent Emergency Repair